gotlost
Kap Chong R Us Member
12:300 to 4:30 watched a free show at the site. DIY made our delivery BUT as you can see they had a problem. Small 6 wheeler with 80 bags of cement at 50kg each and our stuff (steel)on top. It did rain the other night and the ground is still drying out, along with fact that the dirt you see has only been laid for about 2 months so it is not fully compacted. They worked 4 hours. The wife uncle gave it a good go with his Kubota but NFG. Sooo another truck with a crane came down from Prasat. After trying a few moves they decided to off load the cement by the crane afterwards (another hour) of digging the truck out they were able to move it. The truck was reloaded by hand. In all there were 6 from the DIY store on site. The wife will get her uncle with his Kubota back in before it rains to repair her road as its forked.
On the bright side this morning she did get 9 of her prize Thai Lemons aka LIMES (grafted by her) planted and yes the water is from her Lake.
And the two 3m post were set in place.
On the bright side this morning she did get 9 of her prize Thai Lemons aka LIMES (grafted by her) planted and yes the water is from her Lake.
And the two 3m post were set in place.