Actually the time off closed let us do things we saw as needing doing as we worked the place the past few years. It's hard to do with just one day closed to do things needed. So new things were put in place to help both the customers and the staff (my wife) and the head cook in the kitchen. New exhaust vent fan in the kitchen, before only one exhaust opening had only one fan, now there are two. Moved the air con to a better position to cover the entire restaurant better, a new exhaust fan in the dining area to draw out the heat easier when it gets very hot outside, which works well when just using fans to cool the place off. The entire downstairs (dining area, work area, kitchen and bathroom) was newly painted and looks good, also some redecorating was done and refurbishing the kitchen area with more electric outlets, an added sink, and other stuff.
We took out the pizza oven as we no longer will be doing Italian pizzas but just our Mexican style pizzas that do not require that huge oven which really heated up the kitchen area, which also gave us a lot more room to reconfigure the kitchen area. New menus are nearly done which are much easier to read and more professionally done by daughter Starbeam. New check bin folders, new shelving and better furniture inside the back area to make serving placings easier to get and store. An oscillating wall fan now in place in the bathroom as it seemed it was the hottest area in the restaurant, even with the partly open ceiling. Etc. Etc. Etc.
We used the down time well and fixed the things we saw over the past few years that needed upgrading and doing. I tried to make things more efficient for my wife to do her job, and she is very happy with the results, and we wanted to make the place more comfortable and attractive and efficient for our customers. Happy wife = happy husband. LOL