Looks like the footpaths at Surin Immigration could do with an upgrade as well.Just did a look see on the progress. It seems that every excavator, 10&6 wheelers are on the main drag of KC ripping the fork out of the commercial side. Most but not all are closed do to the construction. The photos are at the entrance of Surin Immigration.
Looks like the footpaths at Surin Immigration could do with an upgrade as well.